Chronicle › Yamalo-Nenets Autonomous Okrug › Novy Urengoy — Plant / MIC
Novy Urengoy — Plant / MIC
Novy Urengoy gas condensate preparation plant (Gazprom Pererabotka), design capacity 19.5 mln t of feedstock a year
Novy Urengoy: plant / MIC. One strike recorded, 9 Sep 2026. Under the project’s recovery model it has been out of action for 25 days in the past 12 months and is back in service. The Ukrainian border is about 2800 km away in a straight line.
The map has 2 objects in Yamalo-Nenets Autonomous Okrug; 1 of them has been struck.
Open on the map →Strike history
- 9 Sep 2026dronesNight of 9 September: strike on the Novy Urengoy condensate preparation plant (Gazprom Pererabotka, Yamalo-Nenets okrug) — a fire started at the site and staff were evacuated. Governor Dmitry Artyukhov confirmed a drone attack on the industrial facility. The first strike on Yamal, about 2,800 km from the Ukrainian border.
Other targets of the same type
Dzerzhinsk — Plant / MIC
Kamensk-Shakhtinsky — Plant / MIC
Azov (AOMZ) — Plant / MIC
Aksay (Midel) — Plant / MIC
Aksarayskiy — Plant / MIC
Belgorod (CHP plant) — Plant / MIC
Project sources: en.wikipedia.org · 2025 Russian fuel crisis · en.wikipedia.org · Petroleum industry in Russia · en.wikipedia.org · List of ship losses during the Russo… · en.wikipedia.org · Sinking of the Moskva · en.wikipedia.org · Ukrainian attacks on the Russian shadow… · united24media.com · how many russian oil refineries has… · www.twz.com · ukraine claims scores of russian ships…