RosHlopok RUENUA

Chronicle › Krasnodar Krai › Gelendzhik (substation) — Substation / power line

Gelendzhik (substation) — Substation / power line

Substation / power line

An electrical substation in Gelendzhik; the sources give no name for it, the point is set on the town

Substation / power line
−$70 Mestimate from the cost of objects of this type
Region: Krasnodar Krai
Coordinates: 44.5609, 38.0767
To the Ukrainian border: ~300 km as the crow flies
Status: operational (as of 27 Nov 2026)
Strikes: 1
Days offline in a year: 25 days

Gelendzhik (substation): substation / power line. One strike recorded, 9 Sep 2026. Under the project’s recovery model it has been out of action for 25 days in the past 12 months and is back in service. The Ukrainian border is about 300 km away in a straight line.

The map has 64 objects in Krasnodar Krai; 61 of them have been struck.

Open on the map →

Strike history

Nearby

Project sources: en.wikipedia.org · 2025 Russian fuel crisis · en.wikipedia.org · Petroleum industry in Russia · en.wikipedia.org · List of ship losses during the Russo… · en.wikipedia.org · Sinking of the Moskva · en.wikipedia.org · Ukrainian attacks on the Russian shadow… · united24media.com · how many russian oil refineries has… · www.twz.com · ukraine claims scores of russian ships…